Identity area
Reference code
GB RPSL PB-CORRESP-LB-101005-77
Title
Correspondence regarding project delays and engravings
Date(s)
Level of description
Part
Extent and medium
1 page
Context area
Name of creator
Repository
Archival history
Immediate source of acquisition or transfer
Content and structure area
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
English
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Summary: This page contains a letter from Joshua B. Racy to Messrs Thomas Cooper & Co discussing delays in a project, issues with engravings, and communication between various individuals involved. The letter references locations in Adelaide, South Australia, and mentions several people by name.