Identity area
Reference code
GB RPSL PB-CORRESP-LB-101103-13-182
Title
Letter Discussing Order Execution and Cost Estimates
Date(s)
Level of description
Part
Extent and medium
1 page
Context area
Name of creator
Repository
Archival history
Immediate source of acquisition or transfer
Content and structure area
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
English
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Summary: This page contains a letter expressing concerns about proceeding with an order due to discrepancies in cost estimates. It details the differences between previous and current estimates, itemizes additional expenses, and notes that the government should have anticipated the increased costs. The letter also mentions changes to the order, such as engraving and hardening plates, which further increase the risk and cost.